daylightMAKE ROOM.
A WORKLOAD PLANNER THAT LEAVES ROOM FOR LIFE

A plan is a guess.
Give it some daylight.

You know what needs doing. Find out what fits —
and which small change gives your week room to breathe.

01 / PLAN02 / SEE THE UNCERTAINTY03 / CHANGE ONE THING
YOUR WEEK, THROUGH 1,600 POSSIBLE VERSIONS
Current plan
—all deadlines met
With your change
—all deadlines met
Current Changed

Hours aren’t the whole story.

likely effort / available

Simulation estimates from your assumptions.
Not predictions or guarantees.

Task / prerequisiteHours
Best · likely · worst
DeadlineOn time
Current → changed
Open the model. No black box.

What these numbers mean

A seeded Monte Carlo simulation samples independent triangular task durations from your three estimates. It schedules one student’s work, pauses at the daily hour limit, and respects release days and dependencies.

The percentage is the fraction of simulated weeks that met every deadline. It is conditional on the inputs and this scheduling policy, not an empirically calibrated prediction. A scope cut assumes proportional duration savings without reducing quality; decide whether that tradeoff is realistic.

What it leaves out

Shared bad days, fatigue, task-switching costs, interruptions and changing priorities are not modeled. A heuristic chooses the most urgent downstream deadline; it does not prove an optimal schedule. “Impossible” warnings below are limited to structural constraints.

Everything stays in this browser. No account, AI inference, calendar access or network API. Export a replay to reproduce every result.

YOUR ASSUMPTIONS

Edit task

Must finish first
REAL TIME, NOT WISHFUL THINKING

Your available hours

Time you can actually spend on these tasks. Leave meals, classes and rest outside this budget.